BULKHEADS - HOW WE DO IT

 

DOCKS PIERS RAMPS

 

CHALLENGING SITES

 

WHAT WE USE

 

LINKS TO FRIENDS

Nugent leveling
Nugent accuracy

Whalers level

Drilling for bolt

Drilling for the thru-bolt

Mitch thru-bolt

Readying the thru-bolt

 

 

 

BULKHEADS

“The only way to get a satisfactory product is to be as accurate as possible in every aspect of the job.  That starts the day we arrive on the site”…Paul Nugent

OBTAINING A PERMIT   We can do that for you.

SITE PREPARATION Our equipment is brought to your site through the water on barges. The process begins with removing your existing bulkhead and stockpiling your old ramps or floats if they are to be reconstructed. Debris is removed using our barges and cleared away from the water side, thus reducing the damage to the front of your property.

FRAMING is done with 12' diameter poles and three 6' or 8' whalers.  The poles are from 25 to 35 feet in length, and are set into the mud 10 to 12 feet depending upon strength requirements for circumstances such as adding a pool.

First the soil is loosened by a process called jetting. The poles are dropped in place by a crane and hammered into the mud by a 1500 lb. weight that moves through a shaft called a lead, applying pressure on an exact point. Here again, accuracy is important. Setting poles to this depth assures that your bulkhead will never shift or settle.

WHALERS are massive treated wooden crossbars installed onto the  poles that will bear the weight of the bulkhead.  Nothing less than 3 whalers are adequate for withstanding the hydraulic pressure the bulkhead will have to resist. The top whaler is set with a transit and bolted to the poles with a large timber bolt passing through the whaler anad the pole. The other two whalers below are installed parallel. Accuracy here is critical. The whalers are the cross bars that you see on the finished bulkhead.

“As far as I am concerned, the only sheathing material to use is plastic and  C-Lock installs and performs better than any other product.”…Paul Nugent

SHEATHING  is a vinyl product that is co-extruded vinyl and a vinyl laminate. It is impervious to worms and UV damage. the interlocking C-lock cannot separate and will not leak like a wood tongue and groove installation. 

The sheathing material is installed behind the whalers. Water pressure is used to create a trench by blowing the soil out of the area. The pole sections are lowered by crane, hand guided, and mechanically driven down into the underwater soil and locked into place.

DEAD LOGS are shorter pieces of poles. They are set behind the bulkhead poles back about 15 feet and parallel to the bulkhead.  Tie rods are rods that are are actually 15 foot bolts that pass through the bulkhead pole, the sheathing and the deadlog. Recycled sheathing is installed between the poles adding even more support.  Afterwards this structure is covered with soil and becomes invisible.

The dead log system stabilizes the structure when there is unequal pressure as there can be during a hurricane when the water flows over the top of the bulkhead.

“This process builds the strongest deadlog system in the industry”…Paul Nugent

SHEET RETURNS  are structures run back along the sides of your property line at both ends of your seawall and protect your soil from caving in should your neighbor’s bulkhead be in trouble or need rebuilding. Real protection comes only with a full size top whaler and full length sheeting that extends back at least 6 feet.  The possibility of losing your landscaping at some point is eliminated with this process.

BACKFILLING sometimes requires extra soil trucked in and especially so if the level of your yard needs to be elevated.  Our bobcat does the spreading and the surface will be graded and readied for your landscaper. 

BOARDWALKS are usually built along the edge of the wall to cover the holes from the C-Lock sheathing.  They can be narrow, sometimes just 24” or wide enough to include a deck.

Should you already have a pool or other structure on your waterfront, we can use a different system of deadlogs.

Sign

 

 

Prep work

Loading logs onto our barge

Barge ready

Ready barge

Pounding post

Setting the pole with the weighted lead

Whalers

Whalers set in place

Setting sheathing

Setting the first section of sheathing

HOME   BULKHEADS   PIERS   RAMPS   FLOATING DOCKS   SEAWALLS   BOARDWALKS  LINKS

PAUL NUGENT & SONS MARINE CONSTRUCTION CORPORATION
Freeport, Long Island, New York

PHONE 516-868-1615         FAX 516-771-1470

    LOCAL AND RELIABLE BBB   PROUD TO BE A MEMBER